| 53-03AUG03 - Dee Woods Right Of Way Restoration Project | |||||||||||
| CL Richardson Const. Co. | |||||||||||
| 5.1. | Description of Work | Unit of Measure | Units | Unit Price | Cost | ||||||
| Mobilization | LS | 1 | 1500.00 | $ 1,500.00 | |||||||
| Add fill dirt as needed to fill in channel, eroded areas and bring up level to edge of roadway, Lime, fertilize, seed & place erosion fabric centered on flow line. Mulch remaining areas. | SY | 2672.5 | 4.00 | $ 10,690.00 | |||||||
| Alternate Bid- Add fill dirt as need to fill in channel, eroded areas and bring up level to edge of roadway. Lime, fertilize, seed, & place erosion fabric centered on flow line, Mulch remaining areas. | SY | 1593.1 | 4.00 | $ 6,372.40 | |||||||
| Prepare for over seeding in majority of area. Add top soil to all eroded areas & bring up level with edge of roadway. Will require minor re-grading. Lime, fertilize, seed & mulch. | SY | 3812.6 | 3.50 | $ 13,344.10 | |||||||
| Add fill dirt to channel. Add dirt to channel. Add top soil to areas on slopes & Bring up level to edge of roadway. Lime, fertilize, seed & Place erosion fabric centered on flow line. Mulch remaining areas. | SY | 3116.4 | 4.00 | $ 12,465.60 | |||||||
| Re-grade. Add Dirt to channel. Add top soil to areas on slopes & bring up level to edge of roadway. Lime, fertilize, seed, & place erosion fabric centered on flow line | SY | 1913.5 | 4.00 | $ 7,654.00 | |||||||
| Add fill dirt width of fabric x 3" depth. Lime, fertilize, seed & place erosion fabric along edge of roadway. | SY | 172.3 | 4.00 | $ 689.20 | |||||||
| Type 1 Rock Blanket Placement | CY | 182 | 30.00 | $ 5,460.00 | |||||||
| Recover Rock Blanket, Place & Grout | LS | 1 | 2200.00 | $ 2,200.00 | |||||||
| Placement of Grout on Rock Blanket | SY | 39 | 22.00 | $ 858.00 | |||||||
| Placement of Additional Erosion Control Fabric | SY | 36 | 5.00 | $ 180.00 | |||||||
| 15" CMP Installation w/ 3:1 miter included | LF | 4 | 160.00 | $ 640.00 | |||||||
| 18" CMP Installation w/ 3:1 miter included | LF | 6 | 125.00 | $ 750.00 | |||||||
| 21" CMP installation w/ 3:1 miter included | LF | 12 | 90.00 | $ 1,080.00 | |||||||
| Mailbox Relocation | LS | 1 | 350.00 | $ 350.00 | |||||||
| Total | $ 64,233.30 | ||||||||||
| Statement of Qualifications | Yes | ||||||||||
| Anti-Collusion Statement | Yes | ||||||||||
| Signature & Identity of Bidder | Yes | ||||||||||
| Bidder's Acknowledgement | Yes | ||||||||||
| Bid Bond | Yes | ||||||||||