Bid Tabulation
53-03AUG03 - Dee Woods Right Of Way Restoration Project 
CL Richardson Const. Co.  
5.1. Description of Work Unit of Measure Units Unit Price Cost  
  Mobilization LS 1 1500.00  $   1,500.00  
  Add fill dirt as needed to fill in channel, eroded areas and bring up level to edge of roadway, Lime, fertilize, seed & place erosion fabric centered on flow line. Mulch remaining areas. SY 2672.5 4.00  $  10,690.00  
  Alternate Bid- Add fill dirt as need to fill in channel, eroded areas and bring up level to edge of roadway. Lime, fertilize, seed, & place erosion fabric centered on flow line, Mulch remaining areas. SY 1593.1 4.00  $   6,372.40  
  Prepare for over seeding in majority of area. Add top soil to all eroded areas & bring up level with edge of roadway. Will require minor re-grading. Lime, fertilize, seed & mulch. SY 3812.6 3.50  $  13,344.10  
  Add  fill dirt to channel. Add dirt to channel. Add top soil to areas on slopes & Bring up level to edge of roadway. Lime, fertilize, seed & Place erosion fabric centered on flow line. Mulch remaining areas. SY 3116.4 4.00  $  12,465.60  
  Re-grade. Add Dirt to channel. Add top soil to areas on slopes & bring up level to edge of roadway. Lime, fertilize, seed, & place erosion fabric centered on flow line SY 1913.5 4.00  $   7,654.00  
  Add fill dirt width of fabric x 3" depth. Lime, fertilize, seed & place erosion fabric along edge of roadway. SY 172.3 4.00  $      689.20  
  Type 1 Rock Blanket Placement CY 182 30.00  $   5,460.00  
  Recover Rock Blanket, Place & Grout LS 1 2200.00  $   2,200.00  
  Placement of Grout on Rock Blanket SY 39 22.00  $      858.00  
  Placement of Additional Erosion Control Fabric SY 36 5.00  $      180.00  
  15" CMP Installation w/ 3:1 miter included LF 4 160.00  $      640.00  
  18" CMP Installation w/ 3:1 miter included LF 6 125.00  $      750.00  
  21" CMP installation w/ 3:1 miter included LF 12 90.00  $   1,080.00  
  Mailbox Relocation LS 1 350.00  $      350.00  
  Total      $  64,233.30  
  Statement of Qualifications Yes  
  Anti-Collusion Statement Yes  
  Signature & Identity of Bidder Yes  
  Bidder's Acknowledgement Yes  
  Bid Bond Yes